CASE STUDY SERIES: BALTIMORE MUSEUM OF ART

Baltimore-Museum-of-Art-Case-Study-Featured-Image

THE CHALLENGE

Transferring 2D artwork to a 3D installation space

Maintaining the artwork’s integrity when collaborating with the artist

Simultaneous construction made coordination efforts a key component to adhering to the schedule

OUR APPROACH

A workflow that allowed adjustments on the fly and ensured consistent communication between our design/install teams and the client

Expert knowledge of all 3M products used for drywall, tile, concrete, wood, glass and metal

Estimated 15,000 sq ft of material used

RESULTS

“The museum exterior and lobby were instantly transformed! We’re beyond happy with the experience this will create for our visitors!” -Exhibit Manager


VIDEO

Watch the videos below to see how we handled each part of the installation.